5 LCA Mk1A fighter jets fully ready for delivery to IAF: HAL | India News

5 LCA Mk1A fighter jets fully ready for delivery to IAF: HAL

NEW DELHI: Rubbishing speculation of possible delays in the delivery of the first batch of indigenous LCA Mk1A fighter jets to IAF, Hindustan Aeronautics Limited (HAL) on Thursday said that “five LCA Mk1A aircraft are fully ready for delivery, incorporating major contracted capabilities in accordance with the agreed specifications”.HAL also said that “an additional nine aircraft have already been built and flown. Upon receipt of engines from General Electric (US company), these aircraft will be made ready for delivery”. “All design and development issues identified are being addressed in an expedited manner. HAL is in active discussions with IAF to deliver the aircraft at the earliest,” it said in a statement.

HAL Clarifies AMCA Status, Says It Will Bid For India’s Fifth-Generation Fighter Jet In 2035 Phase

HAL has received five engines from GE as on date. The supply position from GE is positive, and the future delivery outlook aligns with HAL’s delivery plans, the company said. HAL assured that it will meet the guidance projected for the current financial year.Besides LCA Mk1A aircraft, the company said it is simultaneously advancing multiple strategic programmes, including Indian Multi Role Helicopter (IMRH), Tejas LCA Mk2 and Combat Air Teaming System (CATS), all of which are expected to enter production after 2032.HAL had received the first contract from IAF for 83 LCA Mk1A jets (73 fighters and 10 trainers) in Feb 2021, and later, a follow-on contract in Sept 2025 for 97 additional LCA Mk1A aircraft (68 fighters and 29 twin-seaters) at a cost of over Rs 62,370 crore. The delivery of these aircraft would commence during 2027-28 and be completed over a period of six years.The aircraft would have an indigenous content of over 64%, with 67 additional items incorporated. In all, IAF had ordered 180 of these aircraft in two tranches.Some of the planes were supposed to be delivered last year, but IAF insisted that HAL provide the aircraft in a fully operational configuration. On Oct 17 last year, the company conducted the first flight of the first Tejas Mk1A prototype from its Nashik facility. At present, HAL’s fighter aircraft production capacity stands at 24 aircraft per year. At this rate, fulfilling the 180 aircraft Tejas Mk1A order would take over seven years, with IAF expected to receive the complete fleet no earlier than around 2033.Beyond the 180 Mk1A jets, IAF had previously acquired 40 LCA Mk1 (IOC/FOC variants), making a total of 220 LCA-type aircraft contracted or ordered across all variants.

  • Related Posts

    Elon Musk replies to CEO who says: When Google CEO Sundar Pichai starts agreeing with Elon, you need …

    Elon Musk has responded to a post on X (formerly known as Twitter) that highlighted comments by Google CEO Sundar Pichai on the future of data centres. The post, shared…

    Exit poll results 2026 for Bengal, Tamil Nadu, Assam, Kerala, Puducherry: Date, time, where, and how to watch |

    NEW DELHI: With the high-stakes second and final phase of the West Bengal assembly elections 2026 concluding on Wednesday, all eyes are now on exit poll projections that are expected…

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    You Missed

    Rupee falls 18 paise, closes at record low of 95.09 vs $

    Rupee falls 18 paise, closes at record low of 95.09 vs $

    Nepal 163/4 in 34.3 Overs | NEP vs OMA Live Score: Arjun Kumal falls, Aarif Sheikh keeps scoreboard ticking for Nepal vs Oman

    Nepal 163/4 in 34.3 Overs | NEP vs OMA Live Score: Arjun Kumal falls, Aarif Sheikh keeps scoreboard ticking for Nepal vs Oman

    IPL 2026 | Hardik Pandya update: Ryan Rickelton shares latest on MI skipper’s illness | Cricket News

    IPL 2026 | Hardik Pandya update: Ryan Rickelton shares latest on MI skipper’s illness | Cricket News

    SRMJEEE 2026 Phase 1 result today: Check result link, steps to download scorecard

    SRMJEEE 2026 Phase 1 result today: Check result link, steps to download scorecard

    Tom Cruise’s ‘Edge of Tomorrow’ sequel in the works; film could begin filming soon: Reports |

    Tom Cruise’s ‘Edge of Tomorrow’ sequel in the works; film could begin filming soon: Reports |

    Indian billionaire Sudha Reddy stuns at Met Gala 2026

    Indian billionaire Sudha Reddy stuns at Met Gala 2026